
Driveways
A driveway carries vehicle loads every day, so the build-up underneath matters more than the surface on top. We excavate to depth, install a compacted MOT sub-base, concrete-haunch the edgings and finish in the surface you choose.
What's included
- Block paving and cobble setts
- Tarmacadam and asphalt surfacing
- Resin bound gravel
- Loose gravel and shingle drives
- Brickwork edgings, walls and pillars
- Dropped kerbs and access widening
- Aco drainage and permeable build-ups
Built to take the weight
Excavation depth, geotextile membrane and a compacted sub-base laid in layers - the parts you never see are what stop a drive rutting and sinking under a car.
Drainage that meets the rules
New driveways need to deal with surface water on your own land. We use permeable build-ups, channel drains or soakaways so run-off doesn't end up on the pavement.
Common questions
- How long does a driveway take?
- A typical domestic driveway takes three to seven working days depending on size, the amount of dig-out and the surface chosen.
- Do I need planning permission?
- Not usually, as long as the surface is permeable or the water drains to a soakaway or border on your own property. We build it that way as standard.
Driveways in your area
Thinking about driveways?
Tell us what you have in mind and we'll visit, measure up and put together a clear written quotation - free and with no obligation.
